Option | Description |
---|---|
Country | Sabah, Malaysia |
Industry | Power Plant |
Capasity | 330 m3/day WWTP for Biomass Power Plant |
Scope of Work | • Extensive lab test and analysis of high strength waste water (BOD & COD <=250,000 ppm) for Empty Fruit Bunch (EFB) liquor • Detailed Engineering Design, Procurement and Installation of 3-Phase Decanter Oil, Recovery System, Chemical and Biological Treatment System • Chemical Treatment system (chemical reaction tanks, dosing equipment and DAF) • Biological Treatment with RFSC technology • Final Effluent Polishing – Multimedia Filter • Sludge Treatment System (Sludge Holding Tank and Centrifuge Decanter) |
Fig. 140a: Overview Seguntor Biomass Power Plant